Case study · Home · Lancashire

Three phases, one line

Greenpark Bone 60 × 60 tiles laid over several months, with every phase lining up with the last.

Client
Homeowner
Location
Lancashire
Rooms
Conservatories and orangeries, Hallways and porches, Kitchens, Living, dining and extensions
Surfaces
Floor
Cream diamond-pattern floor tiles running through a hallway

The brief

Tile the conservatory, hallway and kitchen diner in stages, months apart, and make it look like one job.

What we did

  1. 01 Recorded the setting-out from phase one so later phases could pick it up exactly
  2. 02 Laid Greenpark Bone 60 × 60 in a diamond pattern through the hallway
  3. 03 Matched grout lines across each join between phases

The result

No one can tell where one phase stops and the next begins.

Got a job like this one?

Tell us about it and we'll come and have a look. Free site visit, detailed quote inside a week.

Phone
01772 334428
Email
info@tilestylelancs.co.uk
Office
Bamber Bridge, Preston
Mon–Fri · 8am–5pm
Coverage
Lancashire and the North West.
Further afield by arrangement.
We'll reply within one working day.